Yolean 3.11.22
🎉 New
- Yolean is now also available in German.
- Yolean is now also available in Norwegian.
- Yolean now supports choosing a project/organization language
- When set, the project/organization language will be displayed for all notifications, boards and list-views specific to your project or organization
- The primary language set for the Yolean site will still be displayed for all generic views such as navigation and start page
- Introducing a new note behavior “weekly task” meant for overall planning on weekly level, designed to fit the production-phase projects in the construction industry
- This note behavior is the first to support resource planning for number of people estimated for a job
- This note behavior is only planned on the weekly level and can therefore not be placed on a specific day
🍰 Enhancements
- Delay dots is always visible in the excel export as a column. An empty cell means no delays.
- Week numbers have been added to the excel export for the tasks job-start, job and job-end.
- It should be easy to see that you are uploading a file and when it is done.
- History entries for note moves show both old and new values. This should make reverting mistakes easier.
- Note Activity is now being showed on all note types and not only for questions.
- Note Activity is now showing edits on the summary and labels.
- New board filter for notes changed today
- New board filter for notes changed in the last 7 days
- Excel export includes a column for last modified timestamp, to be used together with new filters as a record of changes for a known time period.
- Projects not using the trade boards may now hide them through the configuration interface.
- It is now possible to show up to 5 labels on a note.
🐛 Fixes
- The excel export wasn’t functioning properly from rolling schedule boards with generated rows.
- It should not be possible to post a comment when files are still being uploaded to the server.
- In some rare cases, automatic delay dots were duplicated.
- For users with access to a lot of construction projects on the same site, the navigation side-bar loaded very slowly.
- Occasionally, when a note had been moved, the activity log would erroneously say that the zone had been changed.
- Organization/Project administrators can view a list of members for their organization/project, instead of contacting Yolean Support.
- Add support for receiving a single email containing all your notifications for the past 24 hours.
- Rolling Schedules for production can be configured in the same project as rollingschedules for design with generated rows, as long as they include separate where level 1s.
- Trades configured only for production does not generate rows for Rolling Schedules configured for design.
- Trade boards can only display rows for standard where level 1s.
- The activity for a note was not showing special characters correctly.
- Notifications was not showing special characters correctly.
- To make PPC/TA metrics usable for production boards jobs are now included in the PPC/TA calculations
- Note that this does not affect projects using the PPC/TA metrics without the job-type notes